Frank Kendall ordered in September a sweeping review of five lines of effort across the department, seeking to uproot the impediments to current and future readiness.
Operational Imperatives
Change is hard, losing is unacceptable, right? We don’t have a choice about this if we want to win.
Having focused the services’ modernization efforts around seven Operational Imperatives designed to accelerate the injection of new capabilities into the force, Kendall is now setting his sights on organizational impediments to change.
The Heritage Foundation described the Air Force’s readiness levels as “continuing to spiral downward” in its latest assessment of U.S. military strength, leading the conservative think tank to label USAF’s overall strength as “very weak,” its lowest possible grade on a five-point scale. In particular, the ...
As the Department of the Air Force’s sweeping re-optimization review nears its January deadline, the USAF is considering fundamental changes to its major commands. “We’re going to transform the entire Department of the Air Force organizationally to prepare for great power competition within the next quarter,” ...
Kendall has posited a force of at least 1,000 CCAs, with the first ones ready for duty within the next six years. That timeline demands a robust and fast-paced test program.
WORLD: Message from CSAF Gen. David Allvin to Airmen.
More than 100 B-21s will be needed if the nation is to avoid creating a high demand/low capacity capability, panelists said on a Hudson Institute webinar. The B-21's flexibility, stealth, range and payload will be in high demand for a wide range of missions, both ...
The Air Force is taking steps towards starting a geothermal plant at Joint Base San Antonio, Texas, as part of a larger effort to make the branch’s energy infrastructure more resilient and sustainable.