Members of the 380th Expeditionary Aircraft Maintenance Squadron in Southwest Asia have reduced by half the time required to swap an engine on E-3 AWACS surveillance aircraft. While it normally takes about 18 hours to remove and replace an E-3 engine, members of the unit have become so adept at the process that they can execute the exchange in less than nine hours. “I have been doing the flight-line-maintenance thing for over 20 years and I can honestly say this has been the best group of maintainers I’ve ever had the opportunity to work with,” said MSgt. Chuck Ratajczyk, 380th EAMXS lead production superintendent, who calls Tinker AFB, Okla., home. (380th AEW report by TSgt. Denise Johnson)
The rate of building B-21 bombers would speed up if the fiscal 2026 defense budget passes. But it remains unclear how much capacity would be added, and whether the Air Force would simply build the bombers faster, or buy more.