Maj. Gen. Frank Faykes, USAF’s budget director, confirmed that the 2007 defense budget proposal permits USAF to squeeze out four more F-22A fighters—for a total of 183 fighters—and extend deliveries through 2012 until F-35s start rolling out, as General Wood explained above. The 2007 spending plan calls for $2.9 billion to cover primarily the subassembly work for 20 Raptors and some advance procurement costs. The Air Force would restructure the program to produce 20 fighters per year from fiscal 2008 to 2010. For the F-35 Joint Strike Fighter, USAF wants $3.1 billion to cover F-35 systems development and demonstration work, low rate initial production for first five aircraft, and advanced procurement funds for eight JSFs.
Less than a day after arriving in the Middle East, F-15E Strike Eagles from Seymour Johnson Air Force Base, N.C. defended Israel from an Iranian attack in April 2024. DUDE flight, four F-15Es from the 335th Fighter Squadron, downed two dozen Iranian drones in roughly 45 minutes.