Lockheed Delivers Key Sat Components: The Lockheed Martin-led team has completed a critical payload subsystem and software for the first geosynchronous orbit satellite of the Space Based Infrared System, according to Lockheed officials. The SBIRS GEO 1 satellite is scheduled to launch in Fiscal 2008. Lockheed expects to have the completed payload delivered to its Sunnyvale, Calif., facility in 2007.
As Air Force leaders consider concepts of operations for Collaborative Combat Aircraft, sustainment in the field—and easing that support by using standard parts and limiting variants—should be a key consideration, according to a new study from AFA's Mitchell Institute of Aerospace Studies.