The first F-35 Lightning II Joint Strike Fighter test aircraft-dubbed AA-1-in the Air Force’s conventional takeoff and landing configuration arrives at Edwards AFB, Calif., for three weeks of testing. AA-1 is not a production-equivalent version. (See the Dec. 19, 2008 entry on AF-1.)
SDA’s Next Phase of Data Transport Satellites on Hold
June 30, 2025
The long-term future of one of the Space Development Agency’s two satellite constellations is on hold as officials study the options for replacing a planned “data transport layer” with one or more commercial solutions. President Trump’s proposed 2026 defense budget...