Old-fashioned dedication meets modern high-technology manufacturing on the C-130J assembly line.
The KC-46A Pegasus aerial tanker still isn’t meeting required mission capable rates, mostly due to parts shortages, and other significant problems are still being remedied, the Pentagon’s test director said in a new report.